03.18.98

Behind Schedule

Posted in Career at 10 am

Now that I’ve got this thing, I feel like I don’t have much to say.

I’m having troubles with a client at work. Their project is about 2 months behind schedule. There’s about 2 days worth of work left to do on it, but it feels like it might as well be a month.

This project has dragged out so long, I’m burned out. The worse thing about it is that I’m really proud of the design and style of the thing. It’s really a very cool project.

But I’ve got to finish it. Those last couple of feet to the finish line have been the hardest. Perhaps it’s because the finish line has kept moving. That explains a lot.

And I didn’t do anything on yesterday’s to-do list, except for the banners on the online page:

<http://www.omsi.edu/online/>

<??>

RSS feed for comments on this post · TrackBack URL

Leave a Comment